Anaerobic Jar System (3.5 Ltr )
INSTRUCTIONS FOR USE
1. Place the petri dishes in the carrier which should be of the vented variety to aid gas transfer between the
interior and exterior of the plates.
2. Insert Aerobic Indicator Tablet into the smaller (upper) clip in the plate carrier
3. Put the loaded carrier into the polycarbote jar
4. Remove the paper sachet from the foil bag. DO NOT open the paper sachet and immediately place the paper
sachet into an aerobic jar and close the jar lid. DO NOT have to add water or use a catalyst.
5. Place the lid fitted with accessories in the jar after making sure that the silicon „O‟- ring is correctly placed on
the jar. Apply the three-finger clamp and screw down until tight.
6. A metal accessory med as vacuum chuck have to be used for the Evacuation/ Replacement technique to
eble first vacuum to be down.
7. Fit the vacuum chuck connected to the vacuum line to the valve marked as „vacuum‟ and press (not screw).
The open end of the chuck firmly down on to the vacuum valve body. Screwing will damage the sealing rubber
washer and cause the chuck to leak.
8. Evacuate the system to about -30 mm of Hg.
INSTRUCTIONS FOR USE
1. Place the petri dishes in the carrier which should be of the vented variety to aid gas transfer between the
interior and exterior of the plates.
2. Insert Aerobic Indicator Tablet into the smaller (upper) clip in the plate carrier
3. Put the loaded carrier into the polycarbote jar
4. Remove the paper sachet from the foil bag. DO NOT open the paper sachet and immediately place the paper
sachet into an aerobic jar and close the jar lid. DO NOT have to add water or use a catalyst.
5. Place the lid fitted with accessories in the jar after making sure that the silicon „O‟- ring is correctly placed on
the jar. Apply the three-finger clamp and screw down until tight.
6. A metal accessory med as vacuum chuck have to be used for the Evacuation/ Replacement technique to
eble first vacuum to be down.
7. Fit the vacuum chuck connected to the vacuum line to the valve marked as „vacuum‟ and press (not screw).
The open end of the chuck firmly down on to the vacuum valve body. Screwing will damage the sealing rubber
washer and cause the chuck to leak.
8. Evacuate the system to about -30 mm of Hg.
The information below is required for social login
Sign In
Create New Account